Experience

EXPERIENCES

COMPANY

Oil and Gas

1. Solar PV Turn Key Project USD 1.423 MM

Certified for use in hazardous area classification of autonomous stand-alone off-grid solar PV system, 1085-watt, 7 days autonomy including construction - ENI Onshore Receiving Facility, Nov 2017- Aug 2018.

2. Technical Presentation of Generator System Reliability and Life Cycle Assessment
o Chevron Pacific Indonesia, PG&T DURI, Feb 2018.
o Premier Oil, Engineering & Reliability, Jakarta, March 2018.

Power Plant/Electricity

1. Technical Presentation of Generator System Reliability and Life Cycle Assessment :
Geo Dipa Energi – Geothermal Power Plant, Operations, Jakarta, Feb 2018.

2. NIAS 3 x 12-15 MW Biomass Power Plant :
o Pre-feasibility study complete with community forest plantation (HTR), Sept - Nov 2017.
o Investor engagement for King Grass Biomass and CALLIANDRA Biomass, Dec 2017 – Now.

3. SINTANG 1 x 12 MW Biomass Power Plant IDR 3 billion: Pre-feasibility, detailed feasibility study completes with grid interconnection study and permitting prior to power purchase agreement, Mar - Dec 2017.

TEAM MEMBER EXPERTISE

Geothermal Power Plant

Projects

• 120 MW power plant;
• 85 MW power plant;
• 5 MW wellhead mobile power plant;
• Power plant uprating project: increase generation output from 185 MW to 220 MW;
• Electrical distributions and auxiliary power modification and replacement;
• Cooling tower performance improvement;
• Steam ejector;
• Condensate handling;
• Main generator AVR upgrading;
• DCS replacement;
• Plant information (PI);
• I-field;
• Electrical plant information and condition monitoring;
• Electrical protection system upgrading.

Operations

• Experience in plant assessment;
• Develop plant performance & reliability monitoring procedures and implementation;
• Develop LOTO procedures and implementation;
• Develop consequences of deficiencies procedures and implementation;
• Develop FMEA based operator routine duty checklist procedures and implementation;
• Develop FMEA based preventive, predictive and proactive maintenance procedures and implementation;
• Develop electrical HAZOP;
• Certified safety integrity level (SIL) of shutdown system;
• Certified for safety objective analysis facilitator to identify critical protection/safety shutdown system;
• Experience in RCA which generated US$ 60MM loss;

Oil and Gas

• FPU Project: Chevron Offshore Ultra-Deepwater, Chevron West Seno Mooring Buoy for Barge Tethering System, Chevron West Seno Wells Blowdown System;
• FPSO Projects: ConocoPhillips Belanak, Premier Oil Anoa;
• Offshore Platform Projects: ConocoPhillips Belanak, Husky Oil Madura BD, Petronas Carigali SKO, Petronas Carigali Yetagun, Shell Malampaya, Talisman Tweedsmuir J1, Total E&P Tunu Field, Total E&P Sisi Nubi, Total FinaElf E&P Peciko, Unocal Attaka South, Chevron Serang Water Treatment, Chevron Kerindingan Gas Lift System & Compressor, Chevron Shipping Pump Project, Chevron Serang & Melahin Fuel Gas System Upgrade, Unocal Serang Process Pump and Gas Lift Compressor Upgrade;
• Onshore Projects: Pertamina Matindok Gas Development Project, Pertamina South Sumatera Gas Project, LNG Bontang Project, PGN South Sumatra - West Java Gas Pipeline, Chevron Kulin Pipeline & AWT10 Duri Steam Flood Project, Chevron AWT/CGS10 Facility, Duri Steam Flood, Ellipse Energy JRR2 Onshore Gas Plant, Mobil Oil North Sumatera Onshore Gas Development Project, Pertamina-Hess Jambi Merang, Chevron Rangau Gas Boot, Chevron Pungut Waterflood, Chevron SLN Well Fluid Handling Facility;

Power Plant/Electricity

• PLN 150/20 kV substation;

ON GOING PROJECT

1. Certified for use in hazardous classification area of autonomous stand-alone off- grid solar PV system 24 VDC, 30 kWp, 1085-watt DC load, 6 x 1695 AH with 7 days autonomy with ENI (2017 - 2019). The Solar PV system delivered on Oct 2018, waiting on installation schedule.

2. 3 x 12-15 MW Biomass Power Plant complete with community forest plantation - AEI in 2018 - IPP Project

COMPLETED PROJECT

1. 1 x 12 MW Biomass Power Plant: pre-feasibility study, detailed feasibility study completes with grid connection study and permitting prior to PPA with PT. CEN in 2017 - IPP Project
2. Engineering - Plant Assessments:
- Electrical Life Cycle Extension Program
- E-HAZOP
for GEO DIPA ENERGI Patuha - completed in December 2018
3. INSPECTION : Solar PV Battery Recharging 6 x 1500 AH for ENI - completed in November 2018
4. INSPECTION : Solar PV Battery Recharging 6 x 1500 AH for ENI - completed in March 2019